op-chain-ops: extended pause 2 step upgrades
The new storage setter contract with ability to set multiple slots in a single call is deployed at [0xd81f43eDBCAcb4c29a9bA38a13Ee5d79278270cC](https://etherscan.io/address/0xd81f43edbcacb4c29a9ba38a13ee5d79278270cc#code). It was deployed with create2 and should also be on goerli + sepolia and ay other chain that has a superchain deployed on it. Manual calls to `upgradeAndCall` are made. There isn't a great way to support multiple upgrades at a time within `op-upgrade` so adopting a "release" model where `op-upgrade` supports building a single version to another single version makes the most sense. It is too difficult given the current abstractions to build something that supports any upgrade to any upgrade arbitrarily. This sort of system is certainly possible to build but we would need to think more about the abstractions. One thing is this does not support a reverse upgrade aka downgrade. Each storage slot that was set as part of the upgrade to MCP is removed using the `StorageSetter` contract. A link to the storage layout file is included for each call to `setStorage`.
Showing
Please register or sign in to comment