- 
Mark Tyneway authoredMake the ERC721Bridge test setup be part of the same process as the StandardBridge setup so that its possible to have the entire L1 system set up in a single unit test block. This makes writing tests that touch all of the system L1 contracts much more easy. These changes were done with some find and replaces. 13b06bb3