-
Mark Tyneway authored
There was a leftover require from when the contract was `initializable`. This commit removes that because it is no longer needed. Co-authored-by:
mergify[bot] <37929162+mergify[bot]@users.noreply.github.com>
fccba46b
Name |
Last commit
|
Last update |
---|---|---|
.. | ||
ERC721Bridge.sol | ||
IOptimismMintableERC721.sol | ||
OptimismMintableERC721.sol | ||
OptimismMintableERC721Factory.sol |