- 04 Dec, 2023 1 commit
-
-
Sukey authored
-
- 02 Dec, 2023 30 commits
-
-
refcell.eth authored
Update run-challenger.md
-
refcell.eth authored
Merge pull request #8395 from ethereum-optimism/dependabot/npm_and_yarn/testing-library/jest-dom-6.1.5 build(deps-dev): bump @testing-library/jest-dom from 6.1.4 to 6.1.5
-
umba authored
Here are the identified typos and suggested corrections I have: In Prerequisites: "concreate" should be "concrete." In Starting op-challenger: "Run the challenger with these placeholders set." I rephrased it to "Run the challenger after setting these placeholders" for the sake of clarity.
-
refcell.eth authored
challenger: Switch output_cannon to use the new contract type.
-
Mark Tyneway authored
build(deps-dev): bump @types/node from 20.10.1 to 20.10.2
-
dependabot[bot] authored
Bumps [@types/node](https://github.com/DefinitelyTyped/DefinitelyTyped/tree/HEAD/types/node) from 20.10.1 to 20.10.2. - [Release notes](https://github.com/DefinitelyTyped/DefinitelyTyped/releases) - [Commits](https://github.com/DefinitelyTyped/DefinitelyTyped/commits/HEAD/types/node) --- updated-dependencies: - dependency-name: "@types/node" dependency-type: direct:development update-type: version-update:semver-patch ... Signed-off-by:
dependabot[bot] <support@github.com>
-
dependabot[bot] authored
Bumps [@testing-library/jest-dom](https://github.com/testing-library/jest-dom) from 6.1.4 to 6.1.5. - [Release notes](https://github.com/testing-library/jest-dom/releases) - [Changelog](https://github.com/testing-library/jest-dom/blob/main/CHANGELOG.md) - [Commits](https://github.com/testing-library/jest-dom/compare/v6.1.4...v6.1.5) --- updated-dependencies: - dependency-name: "@testing-library/jest-dom" dependency-type: direct:development update-type: version-update:semver-patch ... Signed-off-by:
dependabot[bot] <support@github.com>
-
Mark Tyneway authored
contracts-bedrock: StandardBridge pausability
-
refcell.eth authored
-
refcell.eth authored
-
Adrian Sutton authored
-
Mark Tyneway authored
-
Mark Tyneway authored
-
Mark Tyneway authored
-
Mark Tyneway authored
-
Mark Tyneway authored
-
Mark Tyneway authored
-
Mark Tyneway authored
https://github.com/ethereum-optimism/optimism/pull/8377 is very important because it would catch the regression of this not being caught
-
Mark Tyneway authored
-
Mark Tyneway authored
-
Mark Tyneway authored
Only impacts deposits
-
Mark Tyneway authored
-
Mark Tyneway authored
-
Mark Tyneway authored
-
Mark Tyneway authored
-
Mark Tyneway authored
-
Maurelian authored
Enable extended pause functionality in the standard bridge. Includes updates to tests and the deploy script.
-
Mark Tyneway authored
feat(ctb): Refactor `SemverLock`
-
clabby authored
-
clabby authored
contracts-bedrock: cross domain messenger comment
-
- 01 Dec, 2023 9 commits
-
-
Mark Tyneway authored
-
Mark Tyneway authored
-
Mark Tyneway authored
Improve the comment to make it more accurate in the `L1CrossDomainMessenger`.
-
Mark Tyneway authored
docs: Fix broken PR guideline hyperlink
-
protolambda authored
op-node: Remove Panic while Span Batch Derivation
-
pcw109550 authored
-
Mark Tyneway authored
op-chain-ops: cleanup immutables
-
protolambda authored
op-e2e: Improve e2e test for span batches
-
Mark Tyneway authored
Co-authored-by:
clabby <ben@clab.by>
-